Bridge Power Plant II
POWER PLANT

Bridge Power Plant II

Ghana
2024
Active
Client
Ghana Energy Commission
Duration
Under Operation
Status
Active

Project Overview

Bridge Power Plant II – Ghana (Phase 2): Expansion phase with five (5) GE TM2500 gas turbines (40 MW each), a Triveni steam turbine (80 MW), CMI boilers, SCADA by EMPRESARIOS AGRUPADOS, and integrated ABB TA800 DCS system.

The Challenge

Expanding the existing facility while maintaining continuous operations of Phase I generation units required meticulous planning to avoid disruption and careful coordination of tie-ins to existing systems.

Our Solution

We designed Phase II to be as independent as possible during construction, with integration points carefully planned and executed during scheduled outages. A detailed phased construction plan allowed new equipment installation while Phase I remained operational.

Scope of Work

5× GE TM2500 gas turbines (40 MW each) installation
Triveni GET_6R steam turbine (80 MW) installation
SCADA control system installation and commissioning
Feedwater system (4 pumps) installation
ABB TA800 DCS system installation and integration
Grid interconnection equipment upgrades
Mark VI control system installation and commissioning
CMI one-through boilers installation
Condensate system (3 pumps) installation
Air-cooled condenser system installation
Electrical systems integration and expansion
Performance testing of all units