Deir Ali CCPP-II
Project Overview
Deir Ali CCPP-II (3-unit × 250 MW) Gas and Steam Turbine: We started with METKA providing labour force for testing and operating electrical and mechanical works in the Deir Ali substation (400 KV) and Deir Ali 2 generating station. Key works: commissioning electrical and mechanical works, overhead lines (66kV–20kV), LV/MV cable testing, supervision of MCC panels, switchgears, UPS, power transformers, switchyard equipment, DCS/PLC/field instruments, and complete mechanical circuit testing.
The Challenge
Implementing a complex combined cycle power plant with three 250 MW generation units required precise coordination of gas turbines, steam turbines, and heat recovery systems, demanding the highest levels of technical expertise and quality control.
Our Solution
We assembled an integrated team of engineers and technicians for full project execution. Our team handled testing of both electrical and mechanical systems, and operated the entire station with a dedicated scheduling engineer, quality control engineer, safety officer, and project manager.
Scope of Work
Project Gallery
Interested in Similar Projects?
Contact us to discuss how we can help bring your project to life with our expertise and experience.