Mobile Gas Turbines
Project Overview
Mobile Gas Turbines 6x18.83 Tindouf – Beni Abbes - Tamanrasset General Description of the Project: The Project consists of supervising installation and commissioning of 112 MW site conditions using six (6) mobile Gas turbines with a unit capacity of 18.83 MW adapted to the conditions of each site, at four locations: Tindouf (2 turbines) Beni Abbes (2 turbines) North Tamanrasset (1 turbine) Tamanrasset South (1 turbine) -2 Mobile Gas Turbines 12x20 MW FKIRINA – MSILA The Project consists of supervising installation and commissioning of 240 MW site conditions, 12 mobile Gas turbines with a unit capacity of 20 MW, at two locations: - FKIRINA (6 turbines) - MSILA (6 turbines)
The Challenge
Deploying mobile gas turbines across four remote desert locations in Algeria presented unique challenges including extreme temperatures, difficult terrain logistics, and coordinating simultaneous installations across geographically dispersed sites with limited infrastructure support.
Our Solution
We established dedicated project teams for each location with specialized installation procedures adapted to desert conditions. Rigorous quality control processes were implemented throughout all phases, with advanced troubleshooting protocols ensuring rapid resolution of technical issues across all sites.
Scope of Work
Project Gallery
Interested in Similar Projects?
Contact us to discuss how we can help bring your project to life with our expertise and experience.