SCADA System - AREVA Alstom France
SUBSTATIONS

SCADA System - AREVA Alstom France

SYRIA
2005
Active
Client
Syrian Electricity Transmission / AREVA Alstom France
Duration
Multi-phase
Status
Active

Project Overview

SCADA System / AREVA Alstom France: 1 – SCADA OPC Syria project: Installing and commissioning for SCADA, telecom, adaptation, and control systems for 71 substations (400–230 kV) all over Syria. Started 2004. 2 – SCADA OPC Syria Extension: Installing and commissioning for 15 additional substations (400–230 kV). Started 2005.

The Challenge

Integrating advanced SCADA technology with existing substation equipment from various manufacturers across 71 substations nationwide while ensuring cybersecurity and system reliability.

Our Solution

We implemented a redundant SCADA architecture with primary and backup control centers. Our team worked closely with AREVA Alstom France to integrate communication protocols from multiple equipment manufacturers into a unified system using industry-standard protocols.

Scope of Work

SCADA OPC Syria project: 71 substations (400–230 kV) nationwide
Telecom systems installation and commissioning
SCADA OPC Syria Extension: 15 additional substations (400–230 kV)
Communication network infrastructure
Alarm management and event logging systems
Operator training programs
Installing and commissioning SCADA systems for all substations
Adaptation and control systems installation
Remote Terminal Units (RTUs) installation and configuration
Human-Machine Interface (HMI) workstations
System integration testing and commissioning