SCADA System / AREVA Alstom France: 1 – SCADA OPC Syria project: Installing and commissioning for SCADA, telecom, adaptation, and control systems for 71 substations (400–230 kV) all over Syria. Started 2004. 2 – SCADA OPC Syria Extension: Installing and commissioning for 15 additional substations (400–230 kV). Started 2005.
The Challenge
Integrating advanced SCADA technology with existing substation equipment from various manufacturers across 71 substations nationwide while ensuring cybersecurity and system reliability.
Our Solution
We implemented a redundant SCADA architecture with primary and backup control centers. Our team worked closely with AREVA Alstom France to integrate communication protocols from multiple equipment manufacturers into a unified system using industry-standard protocols.