Syria-Turkey 400 KV Interconnection - Siemens PTD
Project Overview
Syria – Turkey 400 KV Interconnection / Siemens PTD: Zeyzoon: New 400 KV Conventional substation with 3 diameters, 2×300 MVA transformers, 20 KV shunt reactors and capacitors. Aleppo F: Extension of existing 400 KV substation by 2 diameters, 1×300 MVA transformer, 50 MVAr shunt reactor. Hama II: Extension of existing 400 KV substation by 2 Diameters (2 OHL feeders). Jandar: Extension of existing 400 KV substation by 2 Diameters (2 OHL feeders). Lattakia: Construction of new 400KV conventional substation and extension of an existing 230KV substation by 6 feeders. Associated auxiliary works.
The Challenge
Establishing a reliable interconnection across challenging terrain while ensuring grid stability. The project required extensive coordination between the two countries' power authorities with different operational practices and regulatory frameworks.
Our Solution
We designed and installed a robust interconnection system with redundant protection and control capabilities using Siemens advanced technology. Special attention was given to protection coordination to ensure that faults in one system would not propagate to the other.
Scope of Work
Project Gallery
Interested in Similar Projects?
Contact us to discuss how we can help bring your project to life with our expertise and experience.