Home Projects Women's Central Prison in Adra
Women's Central Prison in Adra
Public Buildings

Women's Central Prison in Adra

Adra, Syria
2009
Completed
Client
Ministry of Interior
Duration
Not specified
Status
Completed

Project Overview

Women's Central Prison in Adra: Rehabilitation includes supply and installation of all Electrical, mechanical, control works and civil works. Electrical work: Prison Lighting and Sound system, Main Distribution Board (MDB), Distribution and machines boards, fire alarm, lightning, cabling, security & alarm systems. Mechanical works include: Heating Ventilation & Air Conditioning (HVAC).

The Challenge

Correctional facilities have unique requirements for security, safety, and control. The primary challenge was installing electrical and security systems that provide maximum security while ensuring safety, with all systems required to be tamper-proof and fail-safe.

Our Solution

We implemented a centralized security control system with redundant power supplies and backup systems to ensure continuous operation even during power failures. All electrical installations were designed to prevent tampering, with concealed conduits and secure enclosures.

Scope of Work

Prison lighting systems installation
Main Distribution Board (MDB) installation
Fire alarm systems installation
Cabling works throughout the facility
HVAC systems installation and commissioning
Testing and commissioning of all systems
Sound system engineering and installation
Distribution and machines boards
Lightning protection systems
Security & alarm systems installation
Civil works for system accommodation

Project Gallery

Gallery Image

Interested in Similar Projects?

Contact us to discuss how we can help bring your project to life with our expertise and experience.