The emeg group has implemented numerous key power substations that convert power between lines, transform voltage levels, and perform other functions to distribute electricity from its generation source to the point of need. These substations are essential to the electricity grid, and the group has implemented and installed equipment such as transformers, circuit breakers, and switchgear to control and manage the flow of electricity at different voltage levels
Among the most important projects implemented:
Projects In Syria
1- Syria – Jordan 400 KV Interconnection / Siemens PTD Syria:
• Deir Ali • Dimas • Kisweh
2- Turkey 400 KV Interconnection / Siemens PTD :
• Zeyzoon • Aleppo F • Hama II • Jandar • Lattakia
3- Syria – Iraq 400 KV interconnection / Siemens PTD Syria:
• Adra Substation • Jandar • Nasserieh • Taym • Palmyra
4- 400 KV Interconnection / ISOLUX Spain :
• Aleppo • Hassakeh • Dimas EXT • Tishreen GIS II • Kodsaya S/S
5- Forsan Substation / AREVA France
6- Baramkeh GIS Substation / AREVA France
7- ALEPPO GIS Substation / AREVA France
8- SCADA System / AREVA Alstom France
Projects In Saudi Arabia
1- Tow MV Substation (132 / 34.5 / 13.8 KV )
2- Riyadh Substation 9027 INABENSA Spain GIS ( 380 / 132 / 13.8 KV )
Key Features
- Transformers
- Switchgear to Control
- Manage the Flow of Electricityat
- Circuit Breakers
Benefits
- Construction of new 400 KV conventional substations
- Preassembling and erection the towers