نظرة عامة على المشروع
Our group participated in the implementation of
The Bridge Power plant project I :
A combined cycle power plant consisting of five (5) gas turbines made by GE (Type TM2500), with a maximum load of 40 MW each, using a Mark VI control system
A steam turbine made by Triveni, Type GET_6R, two-stage (LP & HP), with a maximum load of 80 MW, also operated by a Mark VI control system.
Each boiler is connected to a CMI one-through boiler, with two pressure stages (LP and HP), and a SCADA control system by EMPRESARIOS AGRUPADOS, using an Allen-Bradley PLC.
BoP (Balance of Plant) systems include a condensate system (3 pumps), a feedwater system (4 pumps), and an air-cooled condenser system controlled by a DCS system (ABB TA800), which is integrated with all previously mentioned control systems.
معرض الصور