نظرة عامة على المشروع
Our group participated in the implementation of
Bridge Power plant project I :
A combined cycle power plant consisting of five (5) gas turbines made by GE (Type TM2500), with a maximum load of 40 MW each, using a Mark VI control system
A steam turbine made by Triveni, Type GET_6R, two-stage (LP & HP), with a maximum load of 80 MW, also operated by a Mark VI control system.
Bridge Power Project II (Tema) :
Phase 1 of the Bridge Power Project, located in the Tema Heavy Industrial Area in Ghana, and was developed by Early Power Ltd. (EPL) with METKA serving as the EPC contractor. The objective of this phase is to enhance Ghana’s electricity generation capacity using a modern and efficient combined-cycle power configuration.
Stage 1, a 200MW combined cycle gas turbine (CCGT) power plant comprises five (5) General Electric (GE) TM 2500 gen8 units, five (5) once through steam generators (OTSGS), one (1) GE steam turbine unit, an air-cooled condenser (ACC) and associated balance of plant.
15 November 2025